Ystradffin

1.8MW, Mid-Wales
A 1.8MW  hydro scheme located on the river Towy in Mid-Wales.
Site overview
Site: Ystradffin
Construction timeline: 2018/19
Commissioning date: 2019
Location: Mid-Wales
Turbine: Twin Francis
Intake type: Coanda Screen
Gross head: 48m
Catchment area:  89.25km^2
Max turbine flow: 4200lps
Max output: 1.8MW