Logan Gill
450kW, Cumbria
A 450kW project in the Lake District’s Duddon Valley
Site: | Logan Gill |
---|---|
Design surveys: | September 2008 – January 2009 |
Consenting timeline: | March 2009 – August 2009 |
Construction timeline: | August 2009 – July 2010 |
Commissioning date: | July 2010 |
Location: | Lake District |
Turbine: | Gilkes Turgo Impulse |
Generator: | 1000 rpm Asynchronous |
Grid: | 526kVA dedicated sub-statio |
Intake type: | Coanda |
Gross head: | 96m |
Catchment area: | 8.4km2 |
Max turbine flow: | 600lps |
Max output: | 450kW |
Pipeline length: | 1050m |