30kW, Cumbria
A 30kW medium head scheme retrofitted to existing reservoir infrastructure. This project is being developed in conjunction with the Canal & River Trust and is owned by Community Energy Cumbria
Site: |
Killington Reservoir |
Consenting timeline: |
June 2011 – Dec 2013 |
Construction timeline: |
Spring 2016 |
Commissioning date: |
Autumn 2016 |
Location: |
Killington, Cumbria |
Turbine: |
Crossflow |
Generator: |
34kVA 6pole induction |
Intake type: |
Existing draw down pipe |
Gross head: |
15m |
Catchment area: |
8.25km2 |
Max turbine flow: |
300lps |
Max output: |
30kW |
Penstock length: |
~100m |