Holbeck Ghyll, Windermere
88kW, Cumbria
A 88kW project in the Lake District, near Windermere
Site: | Holbeck Ghyll, Windermere |
---|---|
Design surveys: | July 2011 – ongoing |
Consenting timeline: | October 2012 – ongoing |
Location: | Lake District |
Turbine: | to be confirmed |
Generator: | Induction generator, 1500rpm |
Grid: | Three-phase, 100kVA transformer |
Intake type: | ‘letterbox’, C-1200mm |
Gross head: | 105m |
Catchment area: | 1.5km2 |
Max turbine flow: | 0.12m3/s |
Max output: | 88kW |
Pipeline length: | 930 metres |