Hause Gill
100kW, Cumbria
A 100kW high head project on Hause Gill, Seatoller. This scheme is being developed by the National Trust, with Ellergreen providing the consenting works.
Site: | Hause Gill |
---|---|
Consenting timeline: | Jan 2015– Dec 2015 |
Construction timeline: | 2016-2018 |
Commissioning date: | September 2018 |
Location: | Lake District |
Turbine: | Turgo |
Generator: | Synchronous |
Intake type: | Coanda screen |
Gross head: | 144.5m |
Catchment area: | About 1.3km2 |
Max turbine flow: | 97lps |
Max output: | 100kW |
Penstock length: | ~1km |