Glencoyne Beck
100kW, Cumbria
A high head 100kW micro hydro scheme on Glencoyne Beck.
Site overview
Site: | Glencoyne Beck |
---|---|
Construction timeline: | June 2019 – 2020 |
Commissioning date: | 2019 |
Location: | Glencoyne Beck |
Turbine: | Turgo |
Intake type: | Coanda |
Gross head: | 170m |
Catchment area: | 1.6km2 |
Max turbine flow: | 83lps |
Max output: | 100kW |