15kW, Cumbria
A 15kW micro hydro scheme on a Lake District hill farm and Ellergreen’s pilot
Site overview
Site: |
Docker Nook |
Construction timeline: |
August 2009 – February 2010 |
Commissioning date: |
February 2010 |
Location: |
Hill farm |
Turbine: |
Gilkes Turgo Impulse |
Generator: |
1500 rpm Induction Generator with belt drive |
Grid: |
Connected to single phase via existing 15 kVA pole mounted transformer + direct power to farm buildings |
Intake type: |
Coanda D-1200 |
Gross head: |
30m |
Catchment area: |
2.1 km2 |
Max turbine flow: |
90lps |
Max output: |
15kW |
Leat length: |
200m |