46kW, Cumbria
A 46kW scheme providing a hill farm with an additional income
Site: |
Black Beck Longsleddale |
Consenting timeline: |
Jan 2011 – April 2013 |
Construction timeline: |
Sept 2013 – Sept 2014 |
Commissioning date: |
Sept 2014 |
Location: |
Lake District |
Turbine: |
Gilkes Pelton |
Generator: |
Single phase asynchronous generator |
Grid: |
Single phase export via pole mounted transformer |
Intake type: |
Coanda Screen |
Gross head: |
98m |
Catchment area: |
0.90km2 |
Max turbine flow: |
65lps |
Max output: |
46kW |
Penstock length: |
540m |