Anderton Hydro Scheme
22kW, Northwich
A low head 22kW micro hydro scheme on the site of the Anderton Boat lift.
Site overview
Site: | Anderton |
---|---|
Construction timeline: | June 2019 – 2020 |
Commissioning date: | 2019 |
Location: | Northwich |
Turbine: | Crossflow |
Intake type: | Tyrolean |
Gross head: | 15m |
Catchment area: | – |
Max turbine flow: | 240lps |
Max output: | 22kW |