Hafod y Porth
100kW, Snowdonia
A 100kW high head scheme in the mountains of Snowdonia. Our flagship scheme in North Wales with the National Trust.
Site: | Hafod y Porth |
---|---|
Consenting timeline: | June 2012– Jan 2013 |
Construction timeline: | 2013-2014 |
Commissioning date: | September 2014 |
Location: | Snowdonia, Wales |
Turbine: | Hydrolite Turgo |
Generator: | 4 pole synchronous |
Intake type: | Coanda screen |
Gross head: | 134m |
Catchment area: | About 2.32km2 |
Max turbine flow: | 110lps |
Max output: | 100kW |
Penstock length: | 1120m |