Broad Oak
100kW, Cumbria
A 100kW scheme providing farm diversification
Site: | Broad Oak |
---|---|
Consenting timeline: | Nov 2011 – June 2012 |
Construction timeline: | Summer 2012 – 2013 |
Commissioning date: | July 2013 |
Location: | Lake District |
Turbine: | Gilkes Turgo |
Generator: | Three phase asynchronous generator |
Grid: | Three phase export via pole mounted transformer |
Intake type: | Coanda Screen |
Gross head: | 58.5m |
Catchment area: | 9.01km2 |
Max turbine flow: | 232lps |
Max output: | 100kW |
Penstock length: | 730m |