230kW, Cumbria
A low head 230kW micro hydro scheme on Combe Gill.
Site overview
Site: | Combe Gill |
---|---|
Construction timeline: | June 2019 – 2020 |
Commissioning date: | 2019 |
Location: | Combe Gill |
Turbine: | Pelton |
Intake type: | Coanda |
Gross head: | 180m |
Catchment area: | 1.5 km2 |
Max turbine flow: | 173lps |
Max output: | 230kW |