Crosby Gill
100kW, Cumbria
A low head 100kW micro hydro scheme on Crosby Gill.
Site overview
Site: | Crosby Gill |
---|---|
Construction timeline: | June 2019 – 2020 |
Commissioning date: | 2019 |
Location: | Crosby Gill |
Turbine: | Turgo |
Intake type: | Coanda |
Gross head: | 100m |
Catchment area: | 9 km2 |
Max turbine flow: | 137lps |
Max output: | 100kW |