Ystradffin
1.8MW, Mid-Wales
A 1.8MW hydro scheme located on the river Towy in Mid-Wales.
Site overview
Site: | Ystradffin |
---|---|
Construction timeline: | 2018/19 |
Commissioning date: | 2019 |
Location: | Mid-Wales |
Turbine: | Twin Francis |
Intake type: | Coanda Screen |
Gross head: | 48m |
Catchment area: | 89.25km^2 |
Max turbine flow: | 4200lps |
Max output: | 1.8MW |