Abbeystead
190kW, Cumbria
A low head 190kW micro hydro scheme on Abbeystead reservoir.
Site overview
Site: | Abbeystead |
---|---|
Construction timeline: | September 2017 – 2019 |
Commissioning date: | 2019 |
Location: | Abbeystead |
Turbine: | Ossberger Crossflow |
Intake type: | Coanda D-1200 |
Gross head: | 12m |
Catchment area: | 49.33 km2 |
Max turbine flow: | 2000lps |
Max output: | 190kW |