Scandale Beck
900kW, Cumbria
A 900kW high head scheme, the largest in the Lake District
Site: | Scandale Beck |
---|---|
Consenting timeline: | August 2011– Dec 2013 |
Construction timeline: | Sept 2014 – Sept 2015 |
Commissioning date: | 24th November 2015 |
Location: | Lake District |
Turbine: | Gilkes Pelton |
Generator: | Synchronous |
Intake type: | Coanda |
Gross head: | 200m |
Catchment area: | 4.8km2 |
Max turbine flow: | 600lps |
Max output: | 900kW |
Pipeline length: | 2100m |