Cunsey Beck
45kW, Cumbria
A 45kW scheme reviving hydro at an old mill
Site: | Cunsey Beck |
---|---|
Consenting timeline: | Sept 2011 – Aug 2012 |
Construction timeline: | Sept 2013 – May 2014 |
Commissioning date: | 19 August 2014 |
Location: | Lake District |
Turbine: | Crossflow |
Generator: | Single phase asynchronous generator |
Grid: | split phase export to single phase proposed |
Intake type: | Coanda Screen |
Gross head: | 10m |
Catchment area: | 21.7km2 |
Max turbine flow: | 800lps |
Max output: | 45kW |
Pipeline length: | 180m |